BLOGSPOT atas
Showing posts with label CISA Exam Preparation. Show all posts
Showing posts with label CISA Exam Preparation. Show all posts

Friday, December 12, 2014

CISSP Exam Preparation (Question 274)

(274) A significant action has a state that enables actions on an ADP system to be traced to individuals who may then be held responsible. The action does NOT include:

A. Violations of security policy.
B. Attempted violations of security policy.
C. Non-violations of security policy.
D. Attempted violations of allowed actions.

Correct Answer: C


Explanation/Reference:

- Muhammad Idham Azhari

Friday, December 5, 2014

CISSP Exam Preparation (Question 273)

(273) Which of the following embodies all the detailed actions that personnel are required to follow?

A. Standards
B. Guidelines
C. Procedures
D. Baselines

Correct Answer: C


Explanation/Reference:

- Muhammad Idham Azhari

Friday, June 6, 2014

CISA Exam Preparation (Question 110)



(110) A large chain of shops with electronic funds transfer (EFT) at point-of-sale devices has a central communications processor for connecting to the banking network. Which of the following is the BEST disaster recovery plan for the communications processor?
A. Offsite storage of daily backups
B. Alternative standby processor onsite
C. installation of duplex communication links
D. Alternative standby processor at another network node

Explanation:
Having an alternative standby processor at another network node would be the best solution. The unavailability of the central communications processor would disrupt all access to the banking network, resulting in the disruption of operations for allof the shops. This could be caused by failure of equipment, power or communications. Offsite storage of backups would not help, since EFT tends to be an online process and offsite storage will not replace the dysfunctional processor. The provision ofan alternate processor onsite would be fine if it were an equipment problem, but would not help in the case of a power outage, installation of duplex communication links would be most appropriate if it were only the communication link that failed.


- Muhammad Idham Azhari

Thursday, June 5, 2014

CISA Exam Preparation (Question 109)



(109) The MAIN purpose for periodically testing offsite facilities is to:
A. protect the integrity of the data in the database.
B. eliminate the need to develop detailed contingency plans.
C. ensure the continued compatibility of the contingency facilities.
D. ensure that program and system documentation remains current.

Explanation:
The main purpose of offsite hardware testing is to ensure the continued compatibility of the contingency facilities. Specific software tools are available to protect the ongoing integrity of the database. Contingency plans should not be eliminated and program and system documentation should be reviewed continuously for currency.


- Muhammad Idham Azhari

Wednesday, June 4, 2014

CISA Exam Preparation (Question 108)



(108) Disaster recovery planning (DRP) for a company’s computer system usually focuses on:
A. operations turnover procedures.
B. strategic long-range planning.
C. the probability that a disaster will occur.
D. alternative procedures to process transactions.

Explanation:
It is important that disaster recovery identifies alternative processes that can be put in place while the system is not available.


- Muhammad Idham Azhari

Tuesday, June 3, 2014

CISA Exam Preparation (Question 107)



(107) An IS auditor conducting a review of disaster recovery planning (DRP) at a financial processing organization has discovered the following:
The existing disaster recovery plan was compiled two years earlier by a systems analyst in the organization’s IT department using transaction flow projections from the operations department. The plan was presented to the deputy CEO for approval and formal issue, but it is still awaiting his/her attention.
The plan has never been updated, tested or circulated to key management and staff, though interviews show that each would know what action to take for its area in the event of a disruptive incident.
The basis of an organization’s disaster recovery plan is to reestablish live processing at an alternative site where a similar, but not identical, hardware configuration is already established. An IS auditor should:
A. take no action as the lack of a current plan is the only significant finding.
B. recommend that the hardware configuration at each site is identical.
C. perform a review to verify that the second configuration can support live processing.
D. report that the financial expenditure on the alternative site is wasted without an effective plan.

Explanation:
An IS auditor does not have a finding unless it can be shown that the alternative hardware cannot support the live processing system. Even though the primary finding is the lack of a proven and communicated disaster recovery plan, it is essential that this aspect of recovery is included in the audit. If it is found to be inadequate, the finding will materially support the overall audit opinion. It is certainly not appropriate to take no action at all, leaving this important factor untested. Unless it is shown that the alternative site is inadequate, there can be no comment on the expenditure, even if this is considered a proper comment for the IS auditor to make. Similarly, there is no need for the configurations to be identical. The alternative site could actually exceed the recovery requirements if it is also used for other work, such as other processing or systems development and testing. The only proper course of action at this point would be to find out if the recovery site can actually cope with a recovery.


- Muhammad Idham Azhari

Monday, June 2, 2014

CISA Exam Preparation (Question 106)



(106) An IS auditor conducting a review of disaster recovery planning (DRP) at a financial processing organization has discovered the following:
The existing disaster recovery plan was compiled two years earlier by a systems analyst in the organization’s IT department using transaction flow projections from the operations department. The plan was presented to the deputy CEO for approval and formal issue, but it is still awaiting their attention.
The plan has never been updated, tested or circulated to key management and staff, though interviews show that each would know what action to take for its area in the event of a disruptive incident.
The IS auditor’s report should recommend that:
A. the deputy CEO be censured for their failure to approve the plan.
B. a board of senior managers is set up to review the existing plan.
C. the existing plan is approved and circulated to all key management and staff.
D. a manager coordinates the creation of a new or revised plan within a defined time limit.

Explanation:
The primary concern is to establish a workable disaster recovery plan, which reflects current processing volumes to protect the organization from any disruptive incident. Censuring the deputy CEO will not achieve this and is generally not within the scope of an IS auditor to recommend. Establishing a board to review the plan, which is two years out of date, may achieve an updated plan, but is not likely to be a speedy operation, and issuing the existing plan would be folly without first ensuring that it is workable. The best way to achieve a disaster recovery plan in a short time is to make an experienced manager responsible for coordinating the knowledge of other managers into a single, formal document within a defined time limit.


- Muhammad Idham Azhari

Friday, May 30, 2014

CISA Exam Preparation (Question 105)

 (105) Disaster recovery planning (DRP) addresses the:

A. technological aspect of business continuity planning.
B. operational piece of business continuity planning.
C. functional aspect of business continuity planning.
D. overall coordination of business continuity planning.

Explanation:
Disaster recovery planning (DRP) is the technological aspect of business continuity planning. Business resumption planning addresses the operational part of business continuity planning.


- Muhammad Idham Azhari

Wednesday, May 28, 2014

CISA Exam Preparation (Question 104)

(104) Which of the following is a practice that should be incorporated into the plan for testing disaster recovery procedures?

A.Invite client participation.
B. involve all technical staff.
C. Rotate recovery managers.
D. install locally-stored backup.

Explanation:
Recovery managers should be rotated to ensure the experience of the recovery plan is spread among the managers. Clients may be involved but not necessarily in every case. Not all technical staff should be involved in each test. Remote or offsite backup should always be used.


- Muhammad Idham Azhari

Monday, May 26, 2014

CISA Exam Preparation (Question 103)

(103) An advantage of the use of hot sites as a backup alternative is that:
A. the costs associated with hot sites are low.
B. hot sites can be used for an extended amount of time.
C. hot sites can be made ready for operation within a short period of time.
D. they do not require that equipment and systems software be compatible with the primary site.


Explanation:
Hot sites can be made ready for operation normally within hours. However, the use of hot sites is expensive, should not be considered as a long-term solution, and requires that equipment and systems software be compatible with the primary installation being backed up.

- Muhammad Idham Azhari