CISSP Exam Preparation (Question 304)

(304) How should a risk be handled when the cost of the countermeasures outweighs the cost of the risk?

A. Reject the risk
B. Perform another risk analysis
C. Accept the risk
D. Reduce the risk

Correct Answer: C